Road Reconstruction & Culvert Replacement on Good Intent Road

  • Project: Road Reconstruction and Culvert Replacement at Good Intent Road
  • Owner: County of Gloucester
  • Engineer: County of Gloucester
  • Contract Amount: $1,085,336.80
  • Duration: 120 Days
  • Description: This project consists of the partial realignment and widening of the intersection of Good Intent Road and Lower Landing Road. The construction will also included the installation of a 3 sided rigid frame precast culvert along with storm drainage inlets and pipe. The existing roadway is being removed and replaced.