Main St over Rt 206 Bridge Deck Repair

  • Project: Main St over Rt 206 Bridge Deck Repair
  • Owner: New Jersey Department of Transportation
  • Engineer: The Louis Berger Group, Inc.
  • Contract Amount: $1,347,613.63
  • Duration:
  • Description: The bridge deck replacement of Main Street over Route 206 will be constructed in 3 stages. The work consists of installing and maintaining traffic control through the duration of the project, demo and replacement of the existing bridge deck and the milling and overlay of the ingress and digress of the bridge. New curb, sidewalk and parapet will be installed to give the project a completed look.