P14240-Cooper River Dredge

  • Scope: The work to be performed under this contract shall include the removal of approximately 65,000 cubic yards of sediment from the Cooper River Lake, site clearing, soil erosion and sediment control, mobilization and site construction of a rapid dewatering facility, separation of sand and course material, dewatering of the sediment, trucking of the dewatered dredge material to a suitable disposal location, sediment testing as required by the disposal facility, as-built hydrographic survey, and site restoration. Work also includes reconstruction or rehabilitation of approximately 39 outfall structures.