Beverly Rancocas Road Sewer Repair

  • Project: Beverly Rancocas Sewer Repair
  • Owner: Willingboro MUA
  • Engineer: Alaimo Associates
  • Contract Amount:
  • Duration: 2 months
  • Description: Mount needed to install approximately one mile of bypass piping to complete this task as the system processes approximately ten million gallons of sewage per day. The firm was also required to relocate water main and fiber optic, and also suspend and support an existing gas main. All electrical wires in the area were deactivated during crane operations